Guides · 19 Nov 2026

Office move checklist: a timeline for moving office in Sweden

Moving office in Sweden? A checklist and timeline for the office move: notice, the new office, broadband, removals, change of address and handing back.

Stacked moving boxes and a plastic-wrapped office chair in an empty room with terracotta plastered walls and brick, looking out over Stockholm rooftops through an arched window.

An office move (kontorsflytt in Swedish) involves many tasks that need to be done in the right order. Notice on the old lease has to be given in time, the new office has to be found and fitted out, and on moving day the network, the furniture and the team all need to be in place at once. Here is a suggested timetable and a checklist for moving office in Sweden, from the decision to move to the weeks after you have moved in.

Short answer: As a general rule, notice on a fixed-term commercial lease in Sweden must be given nine months before the end of the term, so it is sensible to start planning the office move 9 to 12 months ahead. First check the notice deadline in your lease. Then look for a new office, sign the lease, appoint a move coordinator and order broadband and book a removal firm in good time. Budget for a period of double rent, and finish by handing back the old premises in the condition the lease requires.

How long does an office move take?

How long an office move takes depends on your circumstances. Three things set the timetable:

  • The notice period on your current lease. For a fixed-term commercial lease lasting more than nine months, the general rule is that notice must be given at least nine months before the end of the term, unless a longer notice period has been agreed (Chapter 12, Section 4 of the Land Code (jordabalken)). If notice is not given in time the lease is extended, and for how long depends on what the lease says about renewal.
  • The time it takes to find the right office. Allow time for searching, viewings and negotiation, and more if you are a large team or have special requirements.
  • The fit-out of the new premises. If walls are to be moved or surfaces replaced, the landlord needs time for design and building work before you can move in.

Because the notice period is nine months as a general rule, it is sensible to start 9 to 12 months ahead if you have your own lease. With a shorter notice period and a ready-to-use office to move into, you can plan with less lead time.

Suggested timetable for the office move

WhenWhat you do
9 to 12 months beforeRead the current lease and note the notice deadline, define needs and budget, start looking for a new office
6 to 9 months beforeAttend viewings, negotiate and sign the new lease. Give notice on the old one before its deadline, which may fall earlier
3 to 6 months beforeAppoint a move coordinator, plan the space, order broadband, get quotes for the move
1 to 3 months beforeTell employees, customers and suppliers, clear out and order furniture
The last monthPack, label, change address, plan moving day in detail
Moving dayMove, connect the technology, check that everything has arrived
After the moveHand back the old premises, follow up on defects, update any addresses you missed

The timetable is a suggestion, not a measure of how long each step takes. Plan backwards from the deadline for giving notice under your lease.

Office move checklist, step by step

1. Read your current lease

Find out three things before you do anything else: when the lease term ends, how long the notice period is and what the lease says about reinstatement. Put the notice deadline in your calendar and set a reminder well in advance. How notice must be given, and what applies if you want to leave the lease early, is covered in our guide to terminating a commercial lease.

2. Decide what you need

Use the move to rethink what you need, rather than recreating the same office at a new address. Look at how many people are in at the same time, how much of the day is spent in meetings and how many employees you expect to have in three years. Our guide to office space per employee shows how to work out the right size.

3. Find a new office and sign the lease

Start looking before you give notice on the old lease, so that you know what the alternatives cost. Compare the total annual cost, not only the rent per square metre, and read the lease carefully before you sign. The checklist for renting an office lists every point to check. If you would rather not search yourselves, you can describe what you are looking for and Shace will go through the market for you.

4. Give notice on the old lease

Give notice in writing and well before the deadline. The formal requirements for notice are set out in Chapter 12, Section 8 of the Land Code. If you give notice before the new lease is signed, you risk being left without premises. If the dates do not line up, work out what a few months of double rent costs compared with being tied into a new lease period.

5. Appoint a move coordinator and set a budget

One person should be responsible for the timetable, even if many help. The budget should at least cover:

  • the removal firm and packing materials
  • double rent while the two leases overlap
  • furniture, fittings and signage
  • broadband, network and other technology
  • end-of-tenancy cleaning and any reinstatement of the old premises
  • the fit-out of the new premises, if you pay for any part of it yourselves

6. Plan the new space

Draw up a furniture plan early, showing where teams, meeting rooms, printers and storage will go. If the premises need alterations, the scope, cost and timetable should be set out in the lease or in an appendix. See our guide to tenant fit-outs.

Safety representatives (skyddsombud) must take part in the planning of new or altered premises under Chapter 6, Section 4 of the Work Environment Act (arbetsmiljölagen). Employers in Sweden must also assess the risks of ill health and accidents that a planned change to the business may bring, and a move to new premises is such a change. This follows from the Swedish Work Environment Authority's provisions on systematic work environment management (AFS 2023:1). The assessment is to be done before the change is carried out.

7. Order broadband and technology early

Fibre and a fixed connection can have long lead times and so delay moving in. Ask the landlord which operators are available in the building and order as soon as the lease is signed. Also plan the access system, alarm, printers, meeting room equipment and wireless network, and decide who will connect everything on moving day.

8. Get quotes for the move

Ask for written quotes from a couple of removal firms and let them see the office in person. Check what is included: packing, carrying, dismantling and assembling furniture, insurance and removal of what you are not taking with you. Book the lift and the loading bay in both buildings.

9. Tell employees, customers and suppliers

Tell employees early where you are moving, why and when, and give them a contact person for questions. Then notify customers, suppliers, the bank and the insurance company. Remember to cancel or transfer contracts that are tied to the address, such as cleaning, electricity, alarm, coffee and waste collection.

10. Change your address

Register the new address through verksamt.se. Whether it goes to Bolagsverket (the Swedish Companies Registration Office) or Skatteverket (the Swedish Tax Agency) depends on the type of company and which address is changing. Order mail forwarding. Then update the website, email signatures, invoice templates, the company profile in search engines and map services, and the address held by your suppliers.

11. Clear out, pack and label

Do not move what you do not need. Clear out archives, storage and old equipment a few weeks ahead, and wipe the data on equipment that is to be sold or recycled. Label every box and piece of furniture with a room or zone from the furniture plan, so that everything ends up in the right place straight away.

12. Moving day

Have one person in charge at each site and a list of what needs to be working first. Start with the network and the workstations, so that you can work the next morning even if everything else is still in boxes. Consider moving on a Friday or over a weekend to minimise disruption to the business.

What should you do with the old premises?

The premises must be handed back in the condition the lease specifies. Read what it says about reinstatement: if you have to remove partition walls, signs or cabling that you installed, it can cost both time and money. Book the end-of-tenancy cleaning, walk through the premises with the landlord and write down what you agree. Return all keys and access cards, and read any meters.

During the notice period the landlord may want to show the premises to new tenants. Agree on times that work for your business.

What does an office move cost?

There is no figure that applies to everyone. The cost depends on the size of your team, how much you take with you, how far you move and how much work is needed at both sites. Besides the removal firm, double rent, new furniture and fittings, and reinstatement of the old premises can be large items. So include the whole list under step 5 when you do the sums, and ask for fixed prices where you can.

Frequently asked questions

How far ahead should we start planning an office move?

It is sensible to start 9 to 12 months ahead if you have your own lease, because notice on a fixed-term commercial lease in Sweden must, as a general rule, be given nine months before the end of the term. With a shorter notice period, for example in a serviced office, you can plan with less lead time.

When should we give notice on the old lease?

No later than the date that follows from the lease. For fixed-term commercial leases the general rule is nine months before the end of the term. If you have not signed a new lease by then, you have to weigh the risk of being left without premises against a new lease period in the old ones.

Do we have to reinstate the old premises?

It depends mainly on what the lease says. Read the reinstatement clause early and check with the landlord what is actually required.

Who should we notify when we move office?

Employees, customers, suppliers, the bank, the insurance company and the authorities. The change of address is registered through verksamt.se, and mail can be forwarded for a period.

Can we move without the business coming to a standstill?

You can plan for it. Move over a weekend, make sure the network is running first and let employees work from home on the day when things are most disrupted.

Find the right office faster

Shace searches the whole office market for you, sends a handpicked shortlist within 24 hours and helps with viewings and the lease. Tell us what you need and we will match you with the right office.

This article is general information, not legal, tax or financial advice. Shace is not responsible for decisions made on the basis of it. Speak to a lawyer or other adviser before acting in an individual case.